Built for Architects, Structural & Civil Engineers

Architecture time tracking software.For high-margin design firms.

Architecture time tracking software is a project accounting and labor compliance solution engineered for design and engineering firms to log hours against standard contract phases (Schematic Design, Design Development, Construction Documents, and Construction Administration). By integrating phase-based fee caps with AIA G702/G703 billing workflows, platforms like TimeTrackerOn prevent unbilled scope creep, automate subconsultant markups, and protect project profitability.

Supports standard AIA phase codes • DCAA audit-ready • No credit card required
Project Overview
Civic Arts Center Expansion
Stipulated Sum Contract • AIA G702
Schematic Design (SD)100% Complete
Billed: $45,000 / $45,000 Target Met
Design Development (DD)100% Complete
Billed: $60,000 / $60,000
Construction Documents (CD)84% Burned
$92,400 / $110,000 12 Days to Phase Close
Construction Admin (CA)12% Burned
$6,000 / $50,000
AIA G702 Progress Draft Ready: $32,400
100%
AIA Phase Code Visibility

Real-time fee burn visibility across every design and contract administration milestone.

< 2 Hours
AIA G702/G703 Assembly

Convert approved timesheets and project costs into certified payment applications instantly.

Zero
Unbilled Scope Creep

Automatic alerts when client design revisions exceed contractual phase hour limits.

Phase-Based Accounting

Pre-Configured Architectural Phases: Stop Managing Disconnected Task Lists

Generic time tracking tools force design staff to invent arbitrary task names. TimeTrackerOn ships pre-loaded with industry-standard architectural and engineering work breakdown structures.

  • Turnkey Phase Codes: Track time natively against Schematic Design (SD), Design Development (DD), Construction Documents (CD), Bidding & Negotiation (BN), and Construction Administration (CA).
  • Custom Work Breakdown Structures (WBS): Nest specific tasks beneath core phases (e.g., Code Review, Redlines, MEP Coordination) to identify exact margin leakage points.
  • Not-to-Exceed (NTE) Guardrails: Lock phase time-entry or notify project principals when labor exceeds 80% and 100% of budgeted phase fees.
Phase Assignment
1.0 Schematic Design120h budget
1.1 Conceptual SketchesSelect →
1.2 Client MeetingsSelect →
2.0 Design Development240h budget
G703 Continuation Sheet Preview
Description of WorkScheduled ValueWork Completed%
Schematic Design$45,000$45,000100%
Design Dev$60,000$60,000100%
Construction Docs$110,000$92,40084%
Progress Billing Automation

Generate Application and Certificate for Payment Without Spreadsheet Manipulation

Preparing AIA G702 (Summary Application) and G703 (Continuation Sheet) forms in Excel is prone to rounding errors and delayed client certification.

  • Automated Continuation Sheet Population: Synchronize approved billable hours and fee percentages directly into G703 schedule columns (Work Completed, Stored Materials, and Retainage).
  • Percent-Complete and Milestone Billing: Select whether to bill by labor hours (T&M), agreed percentage-of-completion per phase, or stipulated lump-sum caps.
  • Stipulated Sum & Retainage Tracking: Track standard 5% to 10% retainage withholdings automatically across multi-month construction phases.
Direct Project Expense Recovery

Track Structural, MEP, and Civil Subconsultant Invoices with Precision

A&E firms lose thousands in margin when subconsultant bills and printing costs fail to transfer onto client invoices.

  • Subconsultant Bill Allocation: Tag external engineer invoices directly to project phases with automated contractual markups (e.g., 10% or 15% coordination fees).
  • Reimbursable Expense OCR: Field staff and site architects capture plotting, travel, and permit receipts with our integrated expense management software.
  • Audit-Proof Client Backups: Export full, timestamped expense receipt attachments alongside client fee summaries in a single consolidated PDF billing packet.
Subconsultant Expense Markup
MEP Engineering Inc.
$12,000.00
Coordination Markup
+ 15%
$1,800.00
Total Billed to Client
$13,800.00
DCAA Audit Trail Log
User: Sarah J. (Architect)Oct 20, 09:14 AM
Original: 8.0h (CD Phase)
Revised: 6.5h (CD Phase)
Reason Code: Adjusted hours. 1.5h spent on non-billable firm development.
Government Contract Readiness

DCAA-Compliant Timesheet Logging for Public Sector & Infrastructure Projects

State DOT, Department of Defense, and federal municipal infrastructure contracts demand strict daily labor tracking standards.

  • Daily Punch & Revision Tracking: Require daily timesheet submission with mandatory reason-for-change logging whenever historical time records are amended.
  • Segregated Direct vs. Indirect Costs: Maintain strict accounting isolation between direct billable contract labor, unallowable business development time, and general overhead.
  • Immutable Audit Logs: Maintain complete, tamper-proof logs capturing user ID, timestamp, original value, and revised value for every record, ready for inspection.

Stop Architecture Fee Erosion

How we safeguard margin across every A&E contract type.

Stipulated Lump Sum (Fixed Fee)

The Vulnerability:Scope creep during Construction Documents (CD) burns entire project margin before site kickoff.

TimeTrackerOn Safeguard

Phase Hour Caps: Hard alerts trigger when team logs reach 85% of allocated phase budget, requiring partner override.

Time & Materials (T&M) with NTE

The Vulnerability:Clients reject final invoices due to lack of itemized phase task justification and billing dispute delays.

TimeTrackerOn Safeguard

Real-Time WIP Ledger: Detailed phase narratives linked directly to our time and billing software reporting.

Percentage of Construction Cost

The Vulnerability:Design iterations outpace slow contractor cost estimation updates, leaving firm under-billed.

TimeTrackerOn Safeguard

Milestone Valuation: Connects percent-complete progress directly to construction valuation benchmarks.

Feature Comparison

Generic Trackers vs. Legacy ERPs vs. TimeTrackerOn

Functional CapabilityGeneric Trackers
(Clockify/Toggl)
Legacy ERPs
(Deltek / BQE Core)
TimeTrackerOn
AIA G702 / G703 ExportNot supportedSupported (Complex UI)Native 1-Click Automated
A&E Phase Code StructureManual, flat task listsRigid, complex database setupTurnkey Architectural WBS Pre-sets
Implementation Timeline1 Day (Lacks accounting)3–6 Months (Heavy consulting)Under 5 Business Days
Mobile Site Inspection LoggingBasic timer onlyClunky legacy mobile interfacesGPS-enabled app with offline OCR
Bi-Directional GL SyncBasic CSV exportNative (Closed ecosystem)Direct APIs to Sage & QuickBooks
Pricing ModelCheap (lacks billing)Expensive seat licensesPredictable, transparent per-user
Need simple lists? Check out biweekly timesheet templates.Evaluating ERPs? Compare BQE Core to TimeTrackerOn.

Ecosystem & CAD/BIM/ERP Connections

Push approved expenses and verified time directly into your core accounting ledger.

Sage Intacct Project Accounting

Bi-directional synchronization of project dimensions, phase billing, and employee reimbursable expenses.

Explore Sage Intacct integration Integration

Modern Front-End for Enterprise ERP

Modernize user-facing time capture for design staff while maintaining backend General Ledger integrity for Deltek.

QuickBooks Project & Payroll Sync

Sync approved A&E timesheets and reimbursable client expenses directly to your chart of accounts.

BIM & Project Portal Webhooks

Streamline project setup by syncing active project metadata from project management tools like Revit.

Frequently asked

Technical & Operational Details

Why do architecture and engineering firms need specialized time tracking software?
Design firms operate under complex contract structures (Fixed-Fee, Time & Materials with Not-to-Exceed limits, and Percentage of Construction). Standard time trackers treat work as isolated flat tasks, failing to track hours against standard AIA phases (SD, DD, CD, CA) or capture subconsultant expenses. Architecture time tracking software connects individual project hours directly to fee schedules, preventing unbilled scope creep and accelerating progress billing.
Does TimeTrackerOn support AIA G702 and G703 billing?
Yes. TimeTrackerOn allows project accountants and principals to generate standard AIA G702 (Application and Certificate for Payment) and G703 (Continuation Sheet) data breakdowns directly from verified timesheet hours and approved project expenses, eliminating manual formula errors in Excel.
How does the software help prevent scope creep during the design phases?
Principals can set phase-specific budgets in either billable hours or currency amounts. As architectural staff log time against phases like Schematic Design or Construction Documents, the system tracks the fee burn rate in real time and sends automated notifications when a project hits predefined thresholds (such as 80% of phase fee), prompting timely contract addenda or client change orders.
Is TimeTrackerOn compliant with DCAA timekeeping requirements?
Yes. For firms performing state DOT or federal government infrastructure projects, TimeTrackerOn enforces DCAA compliance standards. This includes daily time entry enforcement, automated change audit trails requiring employee explanation notes for historical edits, and multi-tier supervisor approval sign-offs.

Protect Design Fees and Accelerate AIA Progress Billing

Join over 450 architecture, structural engineering, and design-build firms using TimeTrackerOn to eliminate unbilled scope creep and streamline project accounting.

Full platform access • Custom phase code import • No credit card required